Drilling Learning Platform

NPT Break Mastering NPT Reduction

Capture non-productive time where it happens, route every report through a governed review chain, and turn what the rig learned into an action the next well can actually use.

Offshore drilling platform at sunset
Review chain
  1. 1 Supervisor raises
  2. 2 Engineer classifies
  3. 3 Team leader signs off
84
Reports captured
0
NPT hours logged
52
Reports completed
29
Registered users
Modules

One platform for every drilling learning

Each module runs on the same governed review chain, so nothing ends up captured in a spreadsheet and forgotten.

NPT Incident Reports

Capture the event, the findings, the root cause and the preventive actions - with NPT hours and cost attached to every record.

HSE Flash

Circulate safety learnings across rigs the same day, with the recommendation and the intervention recorded against each event.

Cost Saving

Log and review savings initiatives by asset, team and quarter, so efficiency gains are evidenced rather than claimed.

Highlights

Record what went right. Successful campaigns and initiatives become repeatable practice for the next well.

New Technology

Track trials of new tools and techniques against the offset baseline, with the technical committee reviewing each one.

Rig Move & Delay

Break down every rig move into rig-down, transit, rig-up and NPT, and hold the pending points to close-out.

Observation Reports

Raise field observations with a recommendation attached, routed to the right engineer for action.

Analysis & Dashboards

Compare any two dimensions across the whole dataset - keyword, cause, rig, asset, country or severity.

Workflow

A governed review chain

Every report moves through the same sequence. Each stage is stamped with who received it and when it was submitted, so the audit trail writes itself.

1

Drilling Supervisor

Raises the report from the rig with the event detail and initial observations.

2

Drilling Engineer

Classifies the NPT - owner, cause, sub-cause and severity - and adds the technical detail.

3

Senior Engineer

Reviews the root cause analysis and challenges the findings before they go further.

4

Specialist Engineer

Validates the preventive actions and confirms they are specific enough to act on.

5

Team Leader

Signs the report off. Completed reports feed the dashboards and the analysis page.

6

Technical Committee

Picks up escalated reports and marks the best ones for wider circulation.

Drilling operations
0
NPT hours attributed
Why it works

Why teams run on it

NPT you can actually attribute

Hours and cost are recorded against an owner, a cause and a sub-cause, so the biggest contributors are visible instead of buried in a monthly summary.

Lessons that reach the next well

Learning points are flagged new or repeat. A repeat learning is the signal that a preventive action never landed.

Accountability at every stage

Received and submitted timestamps at each step turn the review chain into an audit trail without anyone maintaining one.

Field context, not just records

Reports carry rig, well, asset, section and coordinates, so patterns show up by formation and location rather than only by date.

Get started

Start cutting non-productive time

Bring your rigs, engineers and technical committee onto one governed workflow, and let the dashboards show where the hours are going.

Get started